top of page

White tank system for a building in Milan - 2015
![]() | ![]() |
---|---|
![]() | ![]() |
![]() | ![]() |
White tank system to build in the 5th belowground level of a building for office in Milan. The new structure must be waterproof, providing a barrier which is the same thickness of the structure. Goal of the solution is to reduce the cost of electricity for pumps used, until now, to reduce and to keep under control the water level.
Analysis and studies for waterproofing walls and slab exposed to hydrostatic pressure; details for injection systems. Position for cracking and expansions joints.
Estimating material and project timescales.
Site supervisor.
Customer: CTC Milano
bottom of page