top of page

Cooling water system in SOCAR refinery plant (Baku - Azerbaijan)
2014
![]() | ![]() |
---|---|
![]() | ![]() |
![]() | ![]() |
Concrete basin for water at the base of FRP cooling tower; concrete basin for separation oil/water; control room and different foundations for pumps and pipe supports; moment resisting frame for cranes. Calculation according to Eurocodes. Seismic analysis in zone 4 for ACI 318 and UBC.
Site supervisor since October 2015 as Civil Specialist.
Here I want to thank Mr Nicolas and Mr. Ramil for the great experience!
Customer: Hamon Thermal Europe – France – www.hamon.com
bottom of page