top of page

Cooling water system in SOCAR refinery plant (Baku - Azerbaijan)

2014

Concrete basin for water at the base of FRP cooling tower; concrete basin for separation oil/water; control room and different foundations for pumps and pipe supports; moment resisting frame for cranes. Calculation according to Eurocodes. Seismic analysis in zone 4 for ACI 318 and UBC.

 

Site supervisor since October 2015 as Civil Specialist.

Here I want to thank Mr Nicolas and Mr. Ramil for the great experience!

 

Customer: Hamon Thermal Europe – France – www.hamon.com

© 2016 by MARCOLIK. Proudly created with Wix.com
 

bottom of page